Hubbard × Josh Holladay
Download the spreadsheet: hours & cost

Website Rebuild Proposal

Hubbard Family Swim School

Prepared by Josh Holladay · October 2, 2026

Scroll to dive in

A site that turns visitors into swimmers.

$34,750
Fixed investment
3–4 months
Kickoff to launch
24 pages
8 custom templates
~300 items
Content migrated

01 · Overview

We will rebuild hubbardswim.com as a modern, mobile-first site that turns more visitors into registered families, for a fixed investment of $34,750 over 3 to 4 months.

The current site has served Hubbard well since its last refresh, but it shows its age. The footer still reads © 2020. Several key family links (Report an Absence, Makeup Request, Cancellation Request) point nowhere. The site runs on an older custom CMS that is hard for staff to update. Parents increasingly browse on their phones, and every extra tap between them and the Register button costs enrollments.

This rebuild keeps everything that works — your content, your search rankings, your iClassPro registration flow — and puts it on Framer, a fast, easy-to-manage platform that your team can update without a developer.

02 · Our three goals

Built for trust, conversion and the AI era.

We have 3 main goals when we engage with companies at the website build level.

01

Built for Trust

A memorable experience that turns first impressions into confidence.

02

Built for Conversion

Every element pushes visitors toward action.

03

Built for the AI Era

Agent-ready structure with SEO, AEO, and GEO baked in.

03 · The platform

Built on Framer.

This project will be developed on Framer, a modern website platform known for fast load times, polished design and simple editing. Your team can update text, images, staff and blog posts directly, without a developer. Here are three Framer sites that show what's possible:

04 · Why this investment

Not a brochure. A business system.

Hubbard's site is not a simple brochure. It is a multi-location business system, and the price reflects five things that make it substantial.

01

A 24-page site, built on eight custom templates

Lessons, programs, four locations, staff, careers, pricing, FAQ, registration, calendar, gift cards and the blog. Each page type gets its own design for desktop and mobile, so every page feels intentional rather than forced into a generic layout.

02

Three content databases your team can manage

Instead of hard-coded pages, we build structured systems:

  • Swim levels (about 15): age range, price, class size and skill focus, entered once and shown everywhere. Change a price once and it updates on the level pages, the pricing page and the overview.
  • Staff directory (about 180 instructors): photo, name, bio, and a filter by location so parents can meet their child's teachers.
  • Locations (4): address, hours, general manager, map and portal link, feeding the locations hub and each location page.
03

About 300 pieces of content migrated

132 blog posts dating back to 2016, about 180 staff profiles and 24 pages of content all move to the new platform with their images, categories, authors and dates intact. Nothing gets lost.

04

Protecting the search rankings you've built over 10 years

We map about 170 existing web addresses to their new homes with permanent redirects, so Google and every bookmarked link still land in the right place. We also add location-specific search markup so each of your four schools shows up for "swim lessons near me" searches. Skipping this step is the most common way a redesign loses traffic and enrollments.

05

Connecting the tools that run your business

Four separate iClassPro portals for registration, logins, absences, makeups and cancellations; JotForm for the Level Finder quiz and special needs inquiries; Constant Contact for email signups; ADP for job applications; and Google Analytics with conversion tracking, so you can see exactly how many visitors click Register at each location.

05 · Scope

What's included.

01

Discovery & strategy

Kickoff and stakeholder interviewsFull content auditNew sitemap and navigation planSEO baseline (current rankings, top pages, backlinks)Analytics and tracking review
02

Design

Style guide (colors, type, buttons, cards, use of the critter level art)Wireframes for 8 page templatesFull homepage design, desktop and mobile7 interior template designs, desktop and mobile2 rounds of revisions
03

Site-wide build

Framer setup and private staging siteHeader with two-level menu and Register / Current Families shortcutsMobile menuHomepage sliderFooter with USSSA, ASSA and ISSA badgesLocation picker for the family portals
04

Page build

HomepageSwim levels database7 lesson and program pagesPricingLocations hub + 4 location pagesStaff directory with location filterAbout, FAQ, Contact, Register, Employment, Calendar, Gift Cards, PrivacyBlog with 11 categoriesBranded 404 page
05

Integrations

iClassPro portals for all 4 locationsJotForm Level Finder and Special Needs formsConstant Contact signupADP careers linkGoogle Analytics 4 + Tag Manager conversion trackingMaps, videos, app store badges and waiver PDF
06

Content migration

132 blog postsAbout 180 staff profiles24 pages of contentAll images optimized for speed with descriptive alt text
07

SEO protection

Redirect map for about 170 web addressesPage titles and descriptions for all 24 pagesLocal business markup for each locationSitemap and Google Search Console setup
08

Quality, launch & training

Testing on iPhone, Android, Chrome, Safari and EdgeAccessibility review to WCAG 2.1 AASpeed optimizationLaunch, domain and security certificate2 weeks of post-launch fixesRecorded staff training and a how-to guide

06 · Timeline

3 to 4 months.

The new site launches at the end of week 14, about 3.5 months after kickoff. Weeks 15–16 are a built-in buffer for post-launch fixes and any feedback delays, so the project finishes inside 4 months.

Development starts as soon as designs are signed off, and content migration overlaps the last weeks of development to save time.

Month 1Plan and design.

We learn how Hubbard's families find and register for classes, map every page, and present the first designs.

Month 2Approve and build.

Designs are finalized and signed off in week 6, and development of the site-wide elements and core pages begins on a private staging site you can preview at any time.

Month 3Build, connect and migrate.

We finish every page, connect iClassPro and the other tools, move the blog, staff and page content, and set up every redirect.

Month 4Test, launch and support.

We test on every major device and browser, launch, train your team, and fix anything that comes up in the two weeks after go-live.

The one thing that most often delays a project like this is waiting on feedback, so we ask for review responses within 3 business days.

07 · Cost breakdown

Where the investment goes.

The $34,750 is allocated across the eight phases by the work each one requires. Page development and design account for half the investment.

1. Discovery & strategyInterviews, content audit, sitemap, SEO baseline

$2,200

2. DesignStyle guide, 8 wireframes, homepage + 7 template designs, 2 revision rounds

$7,700

3. Site-wide buildFramer setup, menus, slider, footer, portal location picker

$2,900

4. Page build24 pages, swim levels database, staff directory, locations, blog

$10,050

5. IntegrationsiClassPro × 4, JotForm, Constant Contact, ADP, analytics tracking

$1,750

6. Content migration132 blog posts, ~180 staff profiles, 24 pages, image optimization

$4,000

7. SEO protection~170 redirects, page titles and descriptions, local search markup

$2,400

8. Quality, launch & trainingDevice testing, accessibility, speed, launch, training, 2 weeks of fixes

$3,750
Total$34,750

Project management, coordination and a reserve for unexpected technical issues are included in each phase, not billed separately.

Want the line-by-line numbers? The spreadsheet breaks every phase down by hours and by cost.

Download spreadsheet

08 · Investment & payment schedule

One fixed fee. Three milestones.

The full scope above is a fixed fee of $34,750, paid in three milestones tied to visible progress.

40% · At signing
$13,900

Project start

At signing

30% · Design approval
$10,425

Design approval

End of month 1–2, when designs are signed off

30% · Launch
$10,425

Launch

When the new site goes live

Payment plans are available.

If a different schedule works better for Hubbard, we're happy to spread the investment out. Just ask.

The fixed fee includes two rounds of revisions per phase. Requests beyond the scope above are quoted in writing as a change order before any work begins, so the price never changes without your approval. We host the site on our account until it goes live. After launch, hosting moves to Hubbard's own account, or we can keep managing it as an add-on. Third-party subscriptions (iClassPro, JotForm, Constant Contact) remain Hubbard's accounts and are billed directly by those providers.

09 · Optional add-ons

Go further.

These are not included in the $34,750 and can be added at any point.

Copywriting / content refresh

Rewrite of all 24 core pages for clarity, enrollment and search

$7,200

Professional photography

Half-day to full-day shoot across locations: classes, facilities, staff

$3,500

Blog post SEO refresh

Update about 40 of the oldest posts (2016–2020) for accuracy and search

$6,000

Spanish-language version

Translation and bilingual setup for core pages

$8,000

Monthly care plan

Platform updates, backups, security monitoring and small content edits

$500/month

Hosting (managed)

Managed hosting for the new site

$100/month

Ongoing SEO retainer

Continued search optimization after launch

$2,500/month

We recommend the monthly care plan. It keeps the site secure and fast after launch and gives your team a direct line for updates.

10 · What we need from Hubbard

Quick decisions keep us on schedule.

The timeline depends on quick decisions as much as on the build. To stay on the 3–4 month schedule, we ask for:

  • One point of contactwith authority to approve designs and content.
  • Feedback within 3 business daysof each review. Each week of delay moves launch by about a week.
  • Admin accessto the current site, domain registrar, Google Analytics, Tag Manager and Search Console in week 1.
  • Updated contentfor any page you want changed, such as new pricing, hours or staff, before the content migration in month 3.